What it involves

  • Starting from the lease

    The work letter, the allowance and the landlord's building standards set what can be built and who pays for it. We read them before pricing.

  • Working in an occupied building

    Noisy work out of hours, protected routes, freight elevator bookings and coordination with building management and the tenants next door.

  • Services

    Tying into the base building's mechanical, electrical, plumbing, fire alarm and sprinkler systems, with the building engineer.

  • Permits and inspections

    Each jurisdiction reviews tenant work and inspects it before the space can be occupied. The service area pages name the office for each place.

  • Opening on the date

    Long-lead items ordered first and inspections booked ahead, because rent usually starts whether the space is ready or not.

Questions about tenant improvements

How long does a build-out take?

It depends on the size of the space, how much of the services must change, and the permit review where the building is. You receive a schedule in preconstruction, before you commit.

Can the landlord's contractor be used instead?

Sometimes the lease requires it for work that touches base-building systems. We work alongside the landlord's trades where that is the rule.