What it involves

  • Estimates that follow the design

    A budget at concept, and again at each stage of the drawings, so the cost of a decision is known when it is made.

  • Schedule

    The whole project laid out: design, permits, purchasing, construction, inspections and move-in, with the dates that cannot move marked.

  • Constructability review

    The drawings read by the people who will build them. What is hard, slow or costly for what it achieves is raised while it is still a line on paper.

  • Long-lead purchasing

    Switchgear, mechanical equipment, elevators, storefront and specialty finishes identified early, and ordered when the schedule says they must be.

  • Permit and logistics plan

    Which approvals the project needs and in what order, and how the site will work: access, hoisting, deliveries, hours and the neighbors.

Questions about preconstruction

When should a contractor join the project?

Before the drawings are finished. The decisions that fix most of a building's cost and schedule are made early in design, which is when an estimate and a constructability review are most useful.

Is preconstruction a separate agreement?

To confirm: how Noble's Crest contracts for preconstruction, and whether its fee is credited to the construction contract.